Los Angeles Department of Water and Power's Electrical Generation Stations Modification Project

Please Review this Disclaimer Before Accessing the Document

The following documents are MS-Word '.doc' or MS-Excel '.xls' files.  If your browser does not display the document, you need to download it then view with MS-Word/MS-Excel.  If you do not have these applications, you can download the free viewers from Microsoft's web site.

compressed file Indicates a compressed self-extracting executable file due to large size.

power plant graphic

Notice of Completion, Title Page, 
Table of Contents

Chapter 1 - Executive Summary

Chapter 2 - Project Description compressed file (3,392 kb)

Chapter 3 - Setting compressed file (1,613 kb)

Chapter 4 - Potential Environmental Impacts and Mitigation Measures compressed file  (1,164 kb)

Chapter 5 - Project Alternatives, Chapter 6 - Cumulative Impacts, Chapter 7 - Organizations and Persons Consulted, and Chapter 8 - References

Appendix A -

Notice of Preparation and Initial Study compressed file (3,106 kb)

Appendix B -

Notice of Preparation and Initial Study Comment Letters and Responses to Comments

Appendix C -

Construction and Operational-Related Air Quality Impacts Estimation Methodologies
(Note: The input/output files for the air dispersion modeling are not available online due to its large size.   To request a hardcopy it is necessary to submit a Public Records Act request.  For information on submitting a request, go to the following link:  http://www.aqmd.gov/prr/index.html

Appendix C  Spreadsheets:

Construction Emissions
Natural gas startup at Harbor Generation Station (HGS)
Normal operations firing natural gas at HGS
Natural gas commissioning at HGS
Oil commissioning at HGS
Diesel oil readiness test at HGS
Scattergood Generation Station (SGS) emissions
Stack gas parameters at SGS
Natural gas startup at Valley Generation Station (VGS)
Normal operations firing natural gas at VGS
Natural gas commissioning at VGS
Oil commissioning at VGS
Oil readiness test at VGS
VGS and HGS black start generator readiness test
Indirect Operational Emissions

Appendix D -

Hazards Risk Analysis Modeling Assumptions and Results
(Note: The hazards risk input/output modeling files are not available online due to its large size.   To request a hardcopy it is necessary to submit a Public Records Act request.  For information on submitting a request, go to the following link:  http://www.aqmd.gov/prr/index.html

Appendix E -

Traffic Impact Analysis compressed file   (2,976 kb)

Appendix F -

Phase I Archaeological Study compressed file (5,180 kb)

Appendix G -

Health Risk Assessment Methodology

Appendix H -

Comments to the Draft EIR and Responses to the Comments