5b. Control Technology
5b1. Manufacturer/Supplier
Ship & Shore
5b2. Description: Name of Control(s):
Three resin spray stations and one gel coat spray station are vented to the rotary carbon adsorber concentrator (11,400 pounds of carbon). The thermal oxidizer has a 1.6 MM Btu/hr natural gas fired burner. The carbon is regenerated by steam, supplied by a waste heat boiler.
|
|
5b3. Control Equipment Permit Application Data
P/C No .: 324505
P/C Issuance Date: 5/28/97
P/O No.: pending
P/O Issuance Date:
5b5. Warranty
Unknown
5b7. Secondary Pollutant
NOx 0.2 lb/hr, CO 0.05 lb/hr
5b9. Limitations
5b11. Operating History
Operating since 3/98
5b13. Source Test Conditions/Performance Data
Report is under review by AQMD (Source Testing Team).
|
5b4. Waste Air Flow to Control Equipment
Flow Rate: 17000
Actual VOC Loading:
Inlet Blower: 60 H.P.
5b6. Primary Pollutant
VOC
5b8. Space Requirement
Unknown
5b10. Location of Prior Demonstration & Agency
Facility: Unknown
Contact Person: Unknown
Phone Number: Unknown
Agency: Unknown
Address: Unknown
Permit Number: Unknown
Contact Person: Unknown
5b12. Source Test/Performance Data Analysis
Date of Source Test:
Capture Efficiency:
Destruction Efficiency:
Overall Efficiency:
Performance Data: Report is being review by Source Testing team. |
|
5c. Cost
5c1. Control Equipment Cost
Capital: $463,750
Installation: Unknown
Capital + Installation: Unknown
Source of Cost Data:
|
5c2. Annual Operational/Maintenance Cost
Unknown
Source of Cost Data: |
|
5d. Demonstration of Compliance
5d1. Date of Field Evaluation
5d3. Compliance Demonstration
5d5. No. of Violations
|
5d2. AQMD Staff Performing Field Evaluation
Engineers Name: Desh Jain
Inspectors Name: Marian Coleman
5d4. Variance
No. of Variances:
Causes:
5d6. Frequency of Maintenance
|