5b3. Control Equipment Permit Application Data
P/C No .: 328007
P/C Issuance Date: 5/28/97
P/O No.: F18616
P/O Issuance Date: 1/5/99
5b5. Warranty
Unknown
5b7. Secondary Pollutant
NOx 0.27 lb/hr, CO 0.16 lb/hr
5b9. Limitations
5b11. Operating History
Operating since 9/97
5b13. Source Test Conditions/Performance Data
The source test was performed at the following conditions:
Inlet flow rate: 13,533 dscfm
VOC emissions to Control: 13.8 lb/hr
VOC emissions to Atmosphere: 0.25 lb/hr
The results may contain errors due to stratification effects in the exhaust duct, however using the worst case scenario, the measured VOC destruction efficiency should be adjusted to 97%.
|
5b4. Waste Air Flow to Control Equipment
Flow Rate: 40,000
Actual VOC Loading: 332
Inlet Blower: 200 H.P.
5b6. Primary Pollutant
VOC
5b8. Space Requirement
Not Known
5b10. Location of Prior Demonstration & Agency
Facility: Not Known
Contact Person: Not Known
Phone Number: Not Known
Agency: Not Known
Address: Not Known
Permit Number: Not Known
Contact Person: Not Known
5b12. Source Test/Performance Data Analysis
Date of Source Test: 3/1/97
Capture Efficiency: 100.00%
Destruction Efficiency: 97.00%
Overall Efficiency: 97.00%
Performance Data: |
|
5c. Cost
5c1. Control Equipment Cost
Capital: $447,961
Installation: Unknown
Capital + Installation: Unknown
Source of Cost Data:
|
5c2. Annual Operational/Maintenance Cost
Unknown
Source of Cost Data: |
|
5d. Demonstration of Compliance
5d1. Date of Field Evaluation
5d3. Compliance Demonstration
Unknown
5d5. No. of Violations
Unknown
|
5d2. AQMD Staff Performing Field Evaluation
Engineers Name: Rene Loof
Inspectors Name:
5d4. Variance
No. of Variances: 0
Causes:
5d6. Frequency of Maintenance
Unknown |