|
The
following letters were written (date sent in parenthesis) by the AQMD commenting on the air quality
analysis.
PDF files require the use of a reader.

Draft
Environmental Impact Reports
Negative Declarations
Notice of Preparation/Initial
Study
-
Notice
of Preparation of a Draft Environmental Impact Report (Draft EIR) for
the
Rose Bowl Stadium Renovation Project (June 29, 2007)
-
Notice of
Preparation of a Draft Environmental Impact Report (Draft EIR) for the
General Plan Amendment No. 04-07 & Zone Change No. 04-13 – JAKS Retail
Center (June 29, 2007)
-
Notice
of Preparation of a Draft Environmental Impact Report (Draft EIR) for
the
2001 Main Street, LLC (June 29, 2007)
-
Notice
of Preparation of a Draft Environmental Impact Report (Draft EIR) for
the
Section 14 Master Plan (June 29, 2007)
-
Notice of
Preparation of a Draft Environmental Impact Report (Draft EIR) for the
Campus Master Plan (June 22, 2007)
-
Initial Study for
Preparation of an Environmental Impact Report
Santa Anita Reservoir Sediment Removal (June 22, 2007)
-
Notice of Preparation of
a Draft Environmental Impact Report (Draft EIR) for the
Metro Universal Project (June 22, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the Widening and
Seismic Retrofitting of the Riverside Drive Bridge (June 21, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the San Diego
Creek Flow Control Channel Programmatic Operations and Maintenance
Project (June 21, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the Nohl Canyon
Water Storage Tank Project (June 21, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the Opus West
Russell Ranch Project (June 19, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the Vernon
General Plan (June 19 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the
Foothill Parkway Westerly Extension Project (June 19, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the Sunset
Boulevard Commercial Project (June 19, 2007)
-
Notice of Preparation of
an Environmental Analysis for the
Millard Canyon and Big Tujunga Fire Safety Project (June
19, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the
Art Center College of Design Master Plan (June 19, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the Eden Rock at
PGA West (June 19, 2007)
-
Notice of Preparation
of a Draft Environmental Impact Report (Draft EIR) for the Chemoil Tank
Farm Expansion Project (June 19, 2007)
-
Notice of Preparation of a Draft Environmental
Impact Report for the Bundy Canyon Road/Scott Road Improvement Project
(June 9, 2007)
-
Recirculation of a Notice of Preparation
of a Draft Environmental Impact Report for 2007 Plan Amendment to the
Merged Central Business District and West End Redevelopment Project Area
(June 9, 2007)
-
Notice of Preparation of a Draft
Environmental Impact Report for the Hollywood Production Center and
Residential Project (June 9, 2007)
-
Notice of Preparation of a Draft
Environmental Impact Report for the DWR Perris Dam Remediation Project
(June 9, 2007)
-
Notice of Preparation of a Draft Environmental
Impact Report for the Del Valle Project, Vesting Tentative Tract Map No.
TR060665 (June 9, 2007)
Return
to the Top of Page
|