|
PROPOSAL:
Execute Truck Fleet Modernization Contracts for the Carl Moyer Program
SYNOPSIS:
On July 7, 2006, the Board approved the release of Program Announcement to
solicit projects at a cost not to exceed $6 million under the Carl Moyer Truck
Fleet Modernization Program. These projects are evaluated on a first-come
first-served basis, and are submitted on a monthly basis to the Board for
approval. This action is to execute fleet modernization contracts in an amount
not to exceed $781,150 from the Carl Moyer Program Fund SB 1107 Account.
COMMITTEE:
Not Applicable
RECOMMENDED ACTION:
- Authorize the Chairman to execute the following contracts under the Carl
Moyer Fleet Modernization Program from the “Year 8” Carl Moyer Program Fund SB
1107 Account:
- A contract with Garcia Trucking to replace one Class 8, 1985 model year
diesel truck (1985 engine) with one Class 8, 2007 model year diesel truck (2007
engine) or newer in an amount not to exceed $28,654.
- A contract with O & S Trucking to replace one Class 8, 1986 model year
diesel truck (1984 engine) with one Class 8, 2007 model year diesel truck (2007
engines) or newer in an amount not to exceed $90,945.
- A contract with Vandendries Excavating to replace one Class 8, 1990 model
year diesel truck (1989 engine) with one Class 8, 2008 model year diesel truck
(2007 engine) or newer in an amount not to exceed $48,415.
- A contract with OC Vacuum to replace five Class 8, Pre-1990 model year
diesel trucks (Pre-1990 engines) with five Class 8, 2008 model year diesel truck
(2007 engine) or newer in an amount not to exceed $390,407.
- A contract with Quality Waste Services to replace one Class 8, 1979 model
year diesel truck (1979 engine) with one Class 8, 2007 model year diesel truck
(2007 engines) or newer in an amount not to exceed $54,075.
- A contract with Statewide Towing/Recovery to replace one Class 7, 1985 model
year diesel truck (1985 engine) with one Class 8, 2007 model year diesel truck
(2007 engines) or newer in an amount not to exceed $80,838.
- A contract with L.R. Verdugo Trucking to replace one Class 8, 1987 model
year diesel truck (1987 engine) with one Class 8, 2008 model year diesel truck
(2007 engines) or newer in an amount not to exceed $87,816.
Barry R. Wallerstein, D.Env.
Executive Officer
Background
In 2005, a heavy-duty on-road fleet modernization program category was added
to the Carl Moyer Program. The Fleet Modernization Program provides financial
incentives to replace older high-polluting diesel trucks with newer lower
emissions diesel and natural gas trucks. At its February 2006 meeting, the Board
set aside $6 million from the “Year 8” funds for the Fleet Modernization
Program. In July 2006, AQMD released the Program Announcement, PA #2007-01, to
solicit projects for this program.
Proposal
This action is to execute heavy-duty truck fleet modernization contracts to replace pre-1990 trucks with model year 2007 and newer diesel trucks in an amount not to exceed $781,150 from the “Year 8” Carl Moyer Program Fund SB 1107 Account.
Table 1, provides a detailed list of all the projects proposed for funding. These projects were chosen based on the first-come first-served criterion and the cost effectiveness of NOx and PM reductions. GPS units will be installed on these trucks under an AQMD contract with a GPS vendor, and the cost will be reimbursed by the Carl Moyer Program.
Total NOx and PM reductions from the recommended projects are approximately 7.74 tons/year and 0.63 tons/year, respectively. All the recommended award recipients have agreed to complete the recommended projects by June 30, 2008.
Outreach
In accordance with AQMD’s Procurement Policy and Procedure, a public notice advertising the RFP/RFQ and inviting bids was published in the Los Angeles Times, the Orange County Register, the San Bernardino Sun, and Riverside County Press Enterprise newspapers to leverage the most cost-effective method of outreach to the entire South Coast Air Basin. Also, staff has held several public workshops in the South Coast Air Basin, advertised in a trade journal, and has used consultants for outreach purposes.
Additionally, potential bidders may have been notified utilizing AQMD’s own electronic listing of certified minority vendors. Notice of the RFP/RFQ have been mailed to the Black and Latino Legislative Caucuses and various minority chambers of commerce and business associations, the State of California Contracts Register website, and placed on the Internet at AQMD’s Web site (http://www.aqmd.gov where it can be viewed by making menu selections “Inside AQMD”/“Employment and Business Opportunities”/“Business Opportunities” or by going directly to http://www.aqmd.gov/rfp/index.html). Information is also available on AQMD’s bidder’s 24-hour telephone message line (909) 396-2724.
Benefits to AQMD
The successful implementation of the proposed projects will help the AQMD significantly reduce NOx and PM10 emissions in a cost effective and expeditious manner. The vehicles funded under this program will operate many years and will provide long-term emissions reductions.
Resource Impacts
The total project cost of $781,150 for the proposed truck fleet modernization projects will be funded from the “Year 8” Carl Moyer Program Fund SB 1107 Account
Attachment:
Table 1: Proposed Heavy-Duty Truck Fleet Modernization Projects
Table 1: Proposed Heavy-Duty Truck Fleet Modernization Projects
| Proposed Fleet Modernization Projects |
No. of Trucks |
Funding Amount
Per Truck |
Main Operation Area |
Vocation |
| Garcia Trucking |
1 |
$28,654 |
South Coast Basin |
Hauling freight |
| O & S Trucking. |
1 |
$90,945 |
South Coast Basin |
Hauling concrete, asphalt and aggregate |
| Vandendries Excavating |
1 |
$48,415 |
South Coast Basin |
Excavation |
| OC Vacuum |
5 |
$87,465
$77,411
$80,318
$64,495
$80,718 |
South Coast Basin |
Hauling liquid waste |
| Quality Waste Services |
1 |
$54,075 |
South Coast Basin |
Hauling solid waste |
| Statewide Towing/Recovery |
1 |
$80,838 |
South Coast Basin |
Tow Company |
| L.R. Verdugo Trucking |
1 |
$87,816 |
South Coast Basin |
Transfer Dump |
| Total |
11 |
$781,150 |
|
|
|