|
| |
 |
Elements of a CAM Plan
|
| Per 40 CFR 64, a CAM plan
must:
- Describe the indicators to be monitored [Section 64.4(a)(1)];
- Describe the ranges or the process to set indicator ranges [Section
64.4(a)(2)];
- Describe the performance criteria for the monitoring, including
[Section 64.4(a)(3)]:
- specifications for obtaining representative data;
- verification procedures to confirm the monitoring's operational
status;
- quality assurance and control procedures
- monitoring frequency
- 4 times per hour (minimum) if post-control emissions are
³ MST; or
- 1 time per day (minimum) if post-control
emissions are < MST.
- Describe indicator ranges and performance criteria for a CEMS, COMS,
or PEMS [Section 64.3(a)(4)];
- Provide a justification for the use of
parameters, ranges, and monitoring approach [Section 64.4(b)];
- Provide emissions test data; and, if
necessary [Section 64.4(c)]
- Provide an implementation plan for
installing, testing, and operating the monitoring [Section 64.4(d)].
|
| |
|