Skip to main content

Share:

Funding Tables

Goods Movement Emission Reduction Funding Program (Proposition 1B) Heavy-Duty Trucks and Transport Refrigeration Units (TRUs)

Below are funding amounts for the different project types.

Funding Tables:

For Heavy-Duty Trucks:

Project Type1

Truck Class

Old Truck Engine Model Year

Replacement Engine Model Year

Maximum             Funding Amounts

Replacement

(2-for-1 also available)

Class 8

2009 or older

New MY2015+ engine zero emission truck2,3

$200,000

New MY2015+ engine hybrid zero emission mile truck2,3

$150,000

New MY2015+ engine optional low-NOx truck (0.02 g/bhp-hr NOx or less) 2,3

$100,000

New MY2015+ engine hybrid truck2,3

$80,000

New MY 2015+ engine natural gas truck2,3,4

$65,000

Class 7

2009 or older

New MY2015+ engine zero emission truck2,3

$200,000

New MY2015+ engine hybrid zero emission mile truck2,3

$150,000

New MY2015+ engine optional low-NOx truck (0.02 g/bhp-hr NOx or less)2,3

$100,000

New MY2015+ engine hybrid truck2,3

$80,000

New MY 2015+ engine natural gas truck2,3,4

$65,000

Class 6

1998 – 2009

New MY2015+ engine zero emission truck2,3

$100,000

New MY2015+ engine hybrid zero emission mile truck2,3

$65,000

New MY2015+ engine optional low-NOx truck (0.02 g/bhp-hr NOx or less) 2,3

$50,000

New MY2015+ engine hybrid truck2,3

$45,000

New MY 2015+ engine natural gas truck2,3,4

$40,000

Three-way Truck Transaction

Class 6/7/8

Truck A: MY2007-2009 engine truck5,6,7

Truck B:
Truck with MY2006 or older engine

Truck C:
New MY 2015+ engine truck as described above

  • Replace Truck A with Truck C2,3

  • Scrap Truck B and replace with Truck A (reuse)

  • Truck A and B may be owned/operated by a different owner.

Contact SCAQMD

Table 1 Notes:

  1. Project life for replacement truck is five years.

  2. Projects may be co-funded with CARB’s Air Quality Improvement Program, Low Carbon Transportation Program, or the California Energy Commission’s (CEC’s) Alternative Renewable Fuel Vehicle Technology Program funds as applicable.

  3. Co-funded projects can only utilize one additional source of State funding and the combined funding may not exceed 90% of the total eligible project cost or any other funding restrictions of each respective program. Projects must meet the requirements of each program providing funding.

  4. Engines must meet the 2010 emission level of 0.20 g/bhp-hr or less NOx (FEL and CERT values) and 0.01 g/bhp-hr or less PM (CERT value). All engines must be approved by CARB to be sold in California.

  5. Truck A must have an original equipment manufacturer (OEM) filter or Level 3 PM retrofit.

  6. Owner of Truck A does not need to specify the business or entity that will accept this truck in the Three-Way Transaction at the time of application.

  7. Truck A may not be used to expand another business or entity’s fleet size.

  8. This option is not available for the existing Class 5 and 6 trucks that have an engine of MY1999.


For Heavy-Duty Trucks - Table 2 (Small Fleets Only):

Project Type

Truck Class

Old Truck Engine Model Year

Replacement Engine Model Year

Maximum Funding Amounts

Repower

Class 8

2009 or older

Repower with new MY2016+ engine1

$20,000

Class 7

2009 or older

Repower with new MY2016+ engine1

$20,000

Class 6

1999 – 2009

Repower with new MY2016+ engine1

$10,000

Table 2 Notes:
The replacement engine must be either zero emission or meeting the optional low-NOx standard.


For Truck Stop Electrification Infrastructure - Table 3:

Project Type

Project Description

Maximum Funding Amounts

Project Life (years)

Truck Stop Electrification

Landside electrification infrastructure at a truck stop, rail yard, or other freight facility.

50% of eligible costs or the calculated funding amount at 0.10 lbs/State $, whichever is lower

10

Electric Charging Stations or Hydrogen Fueling Units

Infrastructure for an electric charging stations or hydrogen fueling units for 3 heavy duty trucks. Funding in addition to the funding for the replacement of a minimum of 3 trucks.

50% of eligible costs or $90,000, whichever is lower

5

You may also like ...

Newsletter Sign Up

Periodic newsletter updates via Email on a variety of air quality-related topics
Submit